


February newsletter out now!
[22.2.2024] Don't miss out on the latest PUSH-IT updates..
Pilot drilling at Litoměřice site commenced
[1.2.2024] Long awaited PUSH-IT pilot drilling launched last week starting with a core well in 550m...
Results of geothermal project, implemented by students of TU Delft in Litoměřice
[13.12.2023] The aim of the project was to bring together multiple aspects of the geoscience...
Visiting students from TU Delft at RINGEN infrastructure
[8.10.2023] Five MSc students from TU Delft, The Netherlands, are hosted by the Charles University in Prague to carry..
Rock permeability and stress fields characteristics measured in the Litoměřice monitoring well
[11.9.2023] Hydraulic tests´results in geothermal PVGT-LT1 borehole published in Geotermics journal...